Switching e-commerce logistics provider takes 7 days. Your sales don’t stop.
What holds people back is almost never the price. It’s this: how long, how much risk, and who handles it while I keep selling. Here is the answer, step by step. Our fastest start is 3 days. The usual lead time is 7 days after the signed quote, with stock transferred and store connected.
Twenty minutes on a video call with a managing director. Diagnostic, price range, migration plan aligned with your notice period. If we’re not the right provider, we’ll say so.
58
migrations completed since 2006
7
days, from signed quote to first shipment
0
days without shipping, thanks to the double run

A 7-day migration, both warehouses running in parallel
Working days from the signed quote. The actual schedule is set around your notice period and the date your stock arrives.
- At Brain e-LogJ1 Specificationsbased on your current instructions, product file imported as is
- At Brain e-LogJ2 Connection installed and testedSKU mapping, dummy orders
- At your current providerJ3 Stock collectionsafety stock calculated on its pending orders
- At Brain e-LogJ4 Receiving, joint countdiscrepancy report the same day
- At Brain e-LogJ5 Three test orders shipped to you
- At Brain e-LogJ6 Connection switched over during off-peak hoursnew returns address set up
- At your current providerJ7 It clears its outstanding ordersdouble run: no orders lost
- At Brain e-LogJ7 First shipmentclose follow-up for 2 weeks
The 7 steps, from first call to first shipment
Total: 7 days after the signed quote. Record: 3 days.
- 01
call back within 24 business hours
First contact
You run the cost calculator, request a quote or book a diagnostic video call. A managing director calls you back within 24 business hours. In 20 minutes, we check three things: your volumes, your products, your destinations. If we’re not the right provider, we’ll say so.
- 02
quote within 24 business hours
Quote and visit
You receive a rate card priced on your actual profile: weights, items per order, destination split, return rate. You come to see the warehouse in Houdeng-Goegnies and meet the team who will pick your orders.
- 03
1 two-hour meeting
Specifications
On site or by video call. SKUs with dimensions and weights, packing instructions, carrier selection rules, returns inspection criteria, priorities by channel. If you’re coming from another provider, the meeting starts from your current instructions, not a blank page.
- 04
test orders included
Connecting your store
We connect your platform to our WMS: Shopify, WooCommerce, PrestaShop, Magento, Odoo, Amazon or bol. Orders flow down, stock levels and tracking numbers flow back. Platform not on the list: API or file.
- 05
on the day the stock arrives
Receiving your stock
You book an unloading slot. We count, check condition, record every SKU and assign locations by turnover. Discrepancies with your list are reported the same day.
- 06
2 to 3 working days
Test orders
You place three real orders on your store. We pick them according to the specifications and you receive the parcels. You approve the packing, the delivery note and the tracking. Anything that isn’t right is fixed before the switchover.
- 07
go-live day, 2 weeks of follow-up
First shipment
On an agreed day, your store switches over. Orders arrive at the warehouse, parcels go out. A managing director follows the first two weeks closely and calls you at the end of the first.
Stay out of fear of change, or switch in 7 days
What usually holds people back, and what happens with us.
Staying with your current provider
Switching to Brain e-Log
Notice periods and exit fees keep you there
2 weeks’ notice, €0 in exit fees
Switching raises fears of days without shipping
Double run: zero days without shipping
Everything would have to be set up from scratch
Product file and instructions taken over as is
A migration seems to take weeks
7 days from signed quote to first parcel, record 3
Your carrier contracts would be lost
You keep your carrier contracts
Switching e-commerce logistics provider, point by point
From another provider
This is the most common case, and the most dreaded. 58 migrations completed since 2006. Six points to settle, in this order.
Your notice period. Check its end date before planning: the double run is timed around it. With us, the notice period is two weeks, with no exit fees. What to check in your current contract before terminating is in our checklist for switching logistics provider.
Stock transfer. We organise collection from your current provider, by full truckload or groupage. Joint count on arrival: your outbound inventory against our inbound count. Discrepancies are documented; they are often used to close the account with the previous provider.
Double run. For a few days, both warehouses run. The old one completes the orders already received, we take those that arrive after the switchover. A safety stock stays with them, calculated on their pending orders; you approve it before collection. Duration: 2 to 5 working days, with no monthly minimum with us during this period.
Connection switchover. On the agreed day, the old 3PL’s connection is deactivated and ours activated, together, during off-peak hours, with an immediate test on a real order. Tracking numbers for orders still in progress at the old provider remain valid.
Your carriers. You keep your contracts if you want to: we print your labels from your accounts. You can also mix, one of your own carriers for France, ours for the rest. The quote compares both, line by line.
Returns still arriving at the old provider. In the weeks after the switchover, parcels come back to their address. They forward them to us by groupage, or you change the returns address on the day of the switchover and we handle everything that arrives after that.
You don’t start from scratch
The export of your product file (SKU, EAN, dimensions, weight): we import it, we don’t re-key it. Your current packing instructions become the first version of the specifications, corrected for whatever wasn’t working. Your branded packaging is delivered to us. Your order history is used to size the bins from day one.
From in-house logistics
The stock is at your premises: we come and collect it, or you deliver it to us. Your team stops picking, but keeps selling. Keep one point person on your side for the first month: they know your products and can answer specification questions quickly.
Two mistakes to avoid. Transferring stock that hasn’t been counted: count before you ship. Transferring SKUs without dimensions or weights: our WMS needs them to choose the location and the carrier.
Two managing directors
Your two points of contact
Florent Roskam and Mathieu Pichelin, managing directors. Florent oversees operations and finance; Mathieu designs the logistics set-up. One of them leads your onboarding from start to finish. You speak to him on the first call, you meet him at the visit, and you keep his number after the first shipment.
Who does what during onboarding
What you prepare
- Your SKU list: SKU, EAN, dimensions, weight. An export from your old WMS is enough.
- Admin access to your store.
- Your packing instructions and branded packaging.
- The outbound inventory of your current stock.
- Your carrier accounts, if you want to keep them.
- The end date of your notice period with your current provider.
- Your volume for the last 3 months and your forecast for the next 3.
What Brain e-Log takes care of
- The quote priced on your profile and a sample monthly invoice.
- Writing the specifications based on the meeting.
- Installing and testing the connection.
- Organising the transfer transport and the unloading slot.
- Receiving, counting, checking and putting stock away.
- Test orders and close follow-up for the first two weeks.
- Customs documents for your first shipments outside the EU.
Everything else is charged by usage, according to the rate card on the e-commerce logistics pricing page. If you manufacture outside the EU, importing your containers is prepared in parallel.
Frequently asked questions about onboarding
01Do my sales stop during the migration?
No. The double run covers the transfer period: the old warehouse finishes its orders, the new one takes the next ones. The connection switchover happens during off-peak hours, with an immediate test. Zero days without shipping.
02How long does the double run last, and who pays for what?
As long as the old warehouse takes to clear its outstanding orders: 2 to 5 working days in practice. During this period, you pay us for receiving and storing the transferred stock, with no monthly minimum. At the old provider, you pay for their notice period: check its end date and we time the switchover around it.
03What about returns still arriving at the old provider?
In the weeks after the switchover, parcels come back to their address. Two options: they forward them to us by weekly groupage (to be arranged when you close your account with them), or you change the returns address on the store and the labels on the day of the switchover, and we handle everything that arrives after that. We give you the new returns address before go-live day.
04Can I start with part of my catalogue?
Yes. Some clients start with their 20 best-selling SKUs and transfer the rest the following month. The specifications are completed as you go.
05Who installs the connection on my store?
We do. You give us admin access, we install it and test it on dummy orders, then on three real orders. You sign off before the switchover.
06What happens if the quantities received don’t match my inventory?
We document the discrepancy, SKU by SKU, on the day of receiving. You receive the report so you can settle it with your previous provider or your team. The stock recorded in our WMS is the stock we counted.
07When should I notify my current logistics provider?
First reread the notice clause in your current contract: that is what sets the switchover date, not the migration. With us, the migration takes 7 days, double run included. We time it around the end of your notice period, so you don’t pay two providers for longer than necessary.
08What if I want to leave?
Two weeks’ notice, no exit fees. We return the stock with an outbound inventory and run the double run in reverse. The same process that brought you in takes you out.
Next step
The 20-minute diagnostic call is step 1. You come away with an answer: the right provider or not, and if so, a date for your first shipment.
A managing director, on a video call from the warehouse. 20 minutes, no commitment. If we’re not the right provider, we’ll say so.