Switching logistics provider: what to check before you cancel
Switching logistics provider is daunting for one specific reason: the risk of a gap between the old provider and the new one, during which nothing ships. That risk is managed with a proven method, not with luck. Here are the key points in brief; the full day-by-day schedule is on the getting started page.

Why switching feels risky, and rightly so
An online retailer switching logistics provider faces one specific scenario: the old provider stops picking before the new one is ready, and orders get stuck in between. The risk is real if it isn’t managed, but there is a standard method for managing it: the double run.
Switching 3PL: the four elements of a successful migration
The notice period. Check the end date of the notice period on your current contract before planning anything: the switchover is set around it, not the other way round. A long notice period means planning early; a short one leaves more flexibility over the start date. It is also the first of the questions to ask a new provider.
The stock transfer. Collection from the old provider and receiving at the new one are carried out with a joint count: your outgoing inventory against the new provider’s goods-in count. Any discrepancies are documented the same day.
The double run. For a few days, both warehouses run in parallel: the old one completes the orders already received, the new one takes those that come in after the switchover. This is the mechanism that guarantees not a single day without shipping.
The connector switchover. On the agreed day, the old provider’s store-to-WMS connection is deactivated and the new one’s is activated, during off-peak hours, with an immediate test on a real order.
What Brain e-Log does
At Brain e-Log, this mechanism runs on a schedule of 7 days from signed quote to first shipment, with a two-week notice period and no exit fees if you ever decide to leave. 58 migrations have been completed using this method.
The full detail, step by step and day by day, with the typical migration schedule and what you prepare on your side, is on the page getting started: switching logistics in 7 days.
See the full onboarding schedule
In short
Switching logistics provider need not interrupt your sales if three things are in place: the notice period checked before planning, a stock transfer verified by joint count, and a double run that covers the transition. The complete method, with the day-by-day schedule, is set out on the page getting started with Brain e-Log.
Frequently asked questions about switching provider
01Will my sales stop during the migration?
No, provided the double run is properly organised: the old warehouse finishes its open orders while the new one takes the next ones. How it works in detail is explained on the getting started page.
02How long does a migration take?
At Brain e-Log, 7 days from signed quote to first shipment, with stock transferred and your store connected. The day-by-day schedule is set out on the getting started page.
03What should I check before cancelling my current contract?
The end date of your notice period and any exit fees. These two factors set the switchover date: never cancel before you have a confirmed first-shipment date with the new provider.